This Coal Fired Power Plant has never been installed. It is boxed, never having been opened, and was kept inside in a dry warehouse.
New cost was around $2,200,000,000.
Our price is a fraction of that original cost.
Unlocking Maximum Output (750 MW)
To optimize performance, the following enhancements can be made:
1. Steam Pressure & Temperature Optimization – Higher steam input improves efficiency.
2. Flow Rate Adjustments – Ensuring adequate energy conversion for higher output.
3. Upgraded Last-Stage Buckets – Longer turbine blades accommodate increased steam flow.
4. Mark VI Control System Optimization – Fine-tuned turbine operation for peak performance.
5. Advanced Generator Cooling & Load Balancing – Maintaining efficiency without overheating.