This 50 Hz Combined Cycle Power Plant has (2) SGT5-2000E(V94.2) Siemens Gas Turbines rated at 139MW each and one Steam Turbine made by LMZ rated at158MW for a total of 436MW.
It has (2) Gas Turbine and (1) Steam Turbine Generator made by Electrosila.
It is equipped with (2) Heat Recovery Boilers, (2) Generator Transformers rated at 400 kv, (2) AUX Transformers, (7) Feedwater Pumps, (2) CEP's, (1) DM Plant, (3) CW Pumps, (3) CW Pump Motors, (1) 16-Cell Cooling tower and (1) Cummins Emergency Diesel Generator rated at 1250kva.
Plant running hours are GT # 1A = 32,361 EOH and GT # 1B = 22,913 EOH.
The operating hours of the Steam Turbine are 17,900 hrs.