Save
This GE Single Shaft Natural Gas Turbine and Generator run either on 50Hz or 60Hz.
It was new in 2018, commissioned in 2024 and has only run 100 hours of test time.
Scope of Supply:
Gas Turbine Engine and Generator
Gas Turbine Enclosure
Auxiiliary System Skid
MTTB: (Motor Trunnion Test Bed/Main Terminal Tie Box)
Control System
Avr (Automatic Voltage Regulator) System
Air Inlet System
Co2 Fire Protection System