(3) 42MW ea GE 6B Gas Turbines LNG Natural Gas or
Light Diesel fuel, 50Hz, will be Fully rebuilt, Re:26424

26424

These (3) 42MW GE 6B Gas Turbines will be Refurbished. A full Warranty as well as FATT is included. Delivery can be discussed. The following will be performed:

Used 6B Gas Turbine Remanufacture Proposal for each 6B Gas Turbine

1) Proposal: repair and renovate the gas turbine body, supporting auxiliary engine, control system and electrical system, retrofit capital components of combustion chamber and turbine, non-DLN combustion chamber, single fuel and natural gas as follows:
1. 6B Gas Turbine Flange to Flange Module - Labor cost for MI
2. Load Gear Box - Labor cost for MI 
3. Generator Major Inspection - Labor cost for MI
4. Self cleaning air inlet filter system - Refurbished equipment
5. Air press unit APU - Supply new equipment
6. Foundation anchoring parts of GT unit - Supply new equipment
7. Gas turbine foundation template - Supply new equipment
8. Acoustical enclosures 1605 - Supply new equipment
9. Vent fan system for GT compartment - Supply new equipment
10. Vent fan system for LGB compartment - Supply new equipment
11. PLENUM EXHAUST ARRGT - Refurbished equipment
12. 88TK enclosure + interconnecting tube - Supply new equipment
13. Oil mist separator - Refurbished equipment
14. Oil mist separator connection pipeline - Refurbished equipment
15. Water Wash skid - Supply new equipment
16. CO2 fire fighting protection container - Supply new equipment
17. Fire interconnecting pipeline - Supply new equipment
18. Unit cooling water interconnection pipe - Supply new equipment
19. Gas turbine generator set sewage pipe - Supply new equipment
20. Gas turbine special tool OEM - Supply new equipment
21. Power cable - Supply new equipment
22. Cable tray - Supply new equipment
23. Turbine control system - Supply new equipment
24. Generator protection panel - Supply new equipment
25. Generator excited control panel - Supply new equipment
26. Motor Control Center - Supply new equipment
27. Gas detection system - Supply new equipment
28. Fire detection System - Supply new equipment
29. Local control room enclosure - Supply new equipment
30. Outgoing cabinet and neutral point cabinet - Supply new equipment
31. Natural gas fuel valve station - Supply new equipment
32. PIPING ARR. GAS - Supply new equipment
33. GAS FUEL SUPPLY SKID - Supply new equipment
34. Reconditioning paint for unit equipment - Manpower + Materials
35. Equipment packaging - Manpower + Materials

Used Power Plants
Specifications
Rating
42MW
42MW
 
Type
Gas Turbines
Gas Turbines
 
Manufacturer
GE
GE
 
Model
6B
6B
 
Fuel
NG/ight Diesel
NG/ight Diesel
 
Hz
50
50
 
Age
Rebuilt
Rebuilt
 
Ref #
26424
26424
 
Note