This gas turbine plant has 16 x 3.3MW gas turbines with the optimal layout of 4 x 4 blocks and was initially
installed as an emergency power supply in preparation for major disasters or large-scale power outages in the
area. Fortunately, as there has been no serious emergency, this plant has had almost no operation, and the total running hours does not exceed 60 hours for each unit until today. However, as the plant has been regularly
checked and well maintained, now the gas turbines units are in the best condition. This power plant is
scheduled to be shut down in December, and it is under review that it will be
possible to sell by the 4 units of one block.
Power Output: 3,457 kW
Turbine Speed: 22,000 rpm
Reduction Gear Speed: 1,800 rpm
Fuel Oil: Natural Gas (start / Stop by Kerosene Oil)
Generator Spec: Model E-AF Meiden