New Machinery


Forging Industry Association logo

Save

Save

Share:

31MW Mitsubishi FT 8 MobilePAC dual 50/60Hz, Fuel Gas/Oil,
limited prep / 2 days to power from arrival at site, unused, Re:26251

26251

The FT8®MOBILEPAC® gas turbine package requires a small footprint utilizing an 80 by 54 foot area.
Very little advanced site preparation is required, and no foundation or concrete pad is necessary for installation of the unit. The unit is transportable by land, sea, or air and modularly packaged for quick, worldwide delivery and installation.

Output 60 Hz/50 Hz: 31MW / 29MW (Dual Frequency)
Fuel Dual Fuel (Gas/Oil)

There are four (4) of these available and all are available immediately!

Used Power Plants
Specifications
Rating
31MW
31MW
 
Type
Gas Turbine
Gas Turbine
 
Manufacturer
Mitsubishi
Mitsubishi
 
Model
FT 8 MobilePAC
FT 8 MobilePAC
 
Fuel
Gas/Oil
Gas/Oil
 
Hz
50/60
50/60
 
Age
2023
2023
 
Ref #
26251
26251
 
Note