This Power Plant is composed of (3) of Gas Turbines (Siemens SGT-800) and (1) Steam Turbine (Siemens SST-900), (3) HRSG (Aalborg- Denmark), (1) ACC (SPX-Belgium), (1) RMS station, HV switchyard and BOP equipment including transformers, spare parts, control system, water conditioning system, etc.
The generated electricity is transmitted to high voltage Switchyard through 28 km (2) x 1272 MCM overhead transmission line. The plant was commissioned as a simple cycle in August 2012 and as combined cycle in June 2013.
The plant was shut down in January 2023 and currently under preservation. Current running hours since new is 30,000.